Husky 28WC01BP-THD Manuale delle Istruzioni Pagina 5

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
  • Pagina
    / 16
  • Indice
  • SEGNALIBRI
  • Valutato. / 5. Basato su recensioni clienti
Vedere la pagina 4
MOUNTING OPTION 1 FOR HANGING CABINET
ON HUSKY® TRACKWALL
MOUNTING OPTION 2 FOR HANGING CABINET
DIRECTLY TO WALL
5
Attach top B and mounting bracket H, as shown
using, (6) BB and (6) DD.
Finger tighten.
Process:
Note: Option 2 is for hanging cabinet directly on wall.
Holes are provided for studs on 16-in and 24-in centers.
Assembly shown for installation on 16-in centers.
Attach top B as shown using (6) screws BB, and
(6) nuts DD.
Finger tighten.
Items Needed:
B - Top (Qty: 1)
BB - 1/4-20 x 3/4-in Button Head Screw (Qty: 6)
DD - 1/4-20 Serrated Flange Nut (Qty: 6)
H - Mounting Bracket (Qty: 1)
RR - Bracket - Wall (Qty: 1)
Items Needed:
B - Top (Qty: 1)
BB - 1/4-20 x 3/4-in Button Head Screw (Qty: 6)
DD - 1/4-20 Serrated Flange Nut (Qty: 6)
Note: Holes in back of cabinet are spaced to allow
mounting on studs with 16-in centers or 24-in centers.
Leave outside holes open to mount to studs on 24-in
centers. Leave inside holes open to mount to studs on
16-in centers.
24-in
16-in
B
H
DDBB
B
BB
DD
Figure 5
Remove the two screws and nuts from the center of
the unit.
Place the Bracket - Wall on the back of the unit and
secure with the screws and nuts removed earlier.
Finger tighten.
Figure 5.1
DD
RR
BB
Figure 6
Figure 6.1
Vedere la pagina 4
1 2 3 4 5 6 7 8 9 10 ... 15 16

Commenti su questo manuale

Nessun commento